|
Action by Subdivider (I)
1. Retain a duly licensed engineer
or surveyor to draw up the plat.
2. Consult with the Village Inspector
preliminary freehand sketch on topographic map.
3. Refer to the following official
documents of the municipality
a. Comprehensive Plan
b. Official Highway Plan
4. Secure the following official
documents from the Village Inspector:
a. Zoning Ordinance
b. Building Code
c. Application forms for approval
d. Subdivision regulations
e. Illinois EPA specifications
5. Secure preliminary review of
site by:
a. Soil and Water Conservation
District
b. Village inspector
6. Secure the following documents
relating to the site:
a. Survey (including topography)
b. Title search
7. Prepare Preliminary Plat of proposed
subdivision complying with all state, county and
municipal regulations and Municipal Zoning Ordinance |